Work Order

.00
$
.00
Sequence Operation Duration Actions
1 Check orings for leak and rupture 1
2 Check the case condition (rust, cracks) 2.5
3 Check orings for leak and rupture 1
4 Check the case condition (rust, cracks) 2.5
5 Check orings for leak and rupture 1
6 Check the case condition (rust, cracks) 2.5